Merge branch 'suspension-alignment-board-rev1' of https://github.com/hytech-racing/circuits-2020 into suspension-alignment-board-rev1
by
19etweinstock
4 years 5 months
Create Suspension Alignment Bord rev1.brd
made preliminary board without LCD
by
noahsb1
4 years 5 months
BMS rev 13/14 (#55)
* Added rev 13 initial swapover
* Used rev 12 updated to share locations of resistors
* Fixed overlapping traces
* Added rev 13 mechancial outline
* Improved rev 6 BMS layout
* Removed rev13 outline
* Created rev 13 and rev 14 that will be modified with the HT05 spring layout
* Fixed incorrect datasheet references
* Updated routing with rev12 fixes
* Updated both schematics and boards to latest library
* Added HVD to diagram
* Added energy meter
* Updated layout
* Added frame to rev13 schematic
* Added frame to rev14 schematic
* Fixed 0 position on silkscreen
* Rev13 dimensions adjusted, requries fixes
* Rev14 dimensions adjusted, requries fixes
* Fixed mounting hole locations, recentered PCB, and fixed 3 spring locations
* Fixed more spring locations
* BMS rev13 mechanical outline created
* Adjusted dimensions of board further
* Fixed routing and silkscreen
* Minor fixes from today's design review
* Removed extra files and started mechanical outlines
* Adjusted dimensions + updated mechanical outlines
* Moved single transistor pad
* Passed DRC and added frames
* Ensures board passes JLC DRC
by
Arvind Srinivasan
4 years 6 months
Update .gitignore for LTSpice files (#54)
* Update .gitignore
* I'm bad at git
Co-authored-by: 19etweinstock <19etweinstock@users.noreply.github.com>
by
19etweinstock
4 years 6 months
Creates license (#39)
* Creates license
* Update README.md
by
Arvind Srinivasan
4 years 7 months
Update README.md (#53)
* Update README.md
* fixed one software guide link
Co-authored-by: shaand1
by
Arvind Srinivasan
4 years 7 months
HV Board rev 12 (#52)
* Work in progress
* Adjusted library
* Continued routing
* Fixing eagle part
* Adjusted filter positions
* Fixed library part for isolated gate driver
* Continuing work
* Continuing routing
* Finished routing
* Adjusting schematic slightly
* Removed unnecessary capacitors and added sense for 60V threshold
* Removed all values
* Working on silkscreen
* Added sensing for OKHS
* Pull down 60V_THRESHOLD_SIGNAL
* HV board rev 12 done
* Changed NE Op-amp to generic
* Added top copper pour
* Adjusted traces slightly
* Increased via sizes, fixed silkscreen labels, approved ERC and DRC errors
* Fixed one via
* Adjusted vias slightly and solved DRC issues
* Final
* Added HV Spacing
* Updating attributes
* Started adjusting tolerances
* Set cap tolerance to 5% and res tolerance to 1%
* Fixed ones skipped
* Removed libraries to match master
* Updated ref to latest library version
* Fixed schematic lack of clarify on STWD100
* Update pull_request_template.md
* Added current frames on frames-update branch
* Updated sheet descriptions
Co-authored-by: yvonneyeh
by
Arvind Srinivasan
4 years 9 months