CHARGE - Rev A.
Pull request #2 completed.
GERBER files created for Rev. A.
by
Michael Pass
5 years 10 months
CHARGE - PR#2 requests made per @rgoedken.
- Third mosfet added in.
- Connector expanded to 8 pin
- AIR+/- added in
- Short device used to handle connections to power rail
- 5A fuse added in. 885 makes 5A.
- 100 ohm gate resistors added into three mosfets.
- DRC/ERC errors checked.
Squash - CHARGE - Final PR revisions.
Squash - CHARGE - Changed resistor values to allow 30mA instead of 20mA.
by
Michael Pass
5 years 10 months
CHARGE - Initial component placement/schematic revision.
A major design decision at this point will be whether or not to mount
the precharger onto the CHARGE board itself.
To determine this, schematic was revised, and parts were created to
test out footprint.
---SQUASH---
CHARGE - Checkout master to add ZEVA library.
ZEVA party created while in CHARGE branch.
Housekeeping down to merge this part into the master branch to make
it available to everyone.
---SQUASH---
SQUASH; CHARGE - Rebase with master
CHARGE - Routing code corruption.
---SQUASH---
CHARGE - Pull request revisions.
Final details finished for formal pull request. Revision requested.
by
Michael Pass
5 years 10 months
Merge pull request #3 from michaelpass/anshu-TSMPC
TSMP-TS Rev A., TSMP-GLV Rev A.
Tractive system has been split into two boards. Major TSMP resistor separation occurs on TS board.
GLV board simply serves to connect multiple chassis points together and to allow connection of black TSMP banana plug.
by
Michael Pass
5 years 10 months
TSMPC - Rev A.
Pull request #3 completed.
GERBER files generated for both TS and GLV boards.
by
Michael Pass
5 years 10 months
TSMPC - GLV, Rev A.
Added in two connectors for chassis connections. X2 goes to TSMP GND connector. Other connector gives 6 access points to ground.
Squash - TSALC - GLV; Fixed mounting holes.
by
Michael Pass
5 years 10 months
TSMPC - DRC error. Ready for final PR#3 reviewal.
Squash - TSMPC - DRC fixes. Output connector polarity labeled.
by
Michael Pass
5 years 10 months
TSMPC - Additional revisions for pull request #3.
Final revisions (apart from connectors and creation of simple GND board) have been done and are ready for review by Anshuman Sahu (and selection of HV connectors)
Squash - TSMPC - Fixed missing connection as per @rgoedken, PR#3.
Squash - TSMPC - Added connectors. PR#3 suggestions. Pending approval.
by
Michael Pass
5 years 10 months
TSMPC - Initial revisions from pull request #3.
Many changes were needed from Anshuman's initial pull request version. Half of the necessary changes have been made here. Connectors must be added. I believe we should also add in a seperate GND board and not have our chassis point on this board, so as to avoid potential isolation issues.
by
Michael Pass
5 years 10 months