ACCUM - Initial schematic revision. Schematics have still not been properly updated from ESF versions. In this commit, I've added in some external connectors (LED, etc.) ---SQUASH--- ACCUM - Initial revision; break to checkout TSALC.
by Michael Pass 5 years 10 months
b7e148e4
Merge pull request #8 from michaelpass/anshu-TSALC TSALC - Rev A.
by Michael Pass 5 years 9 months
4a5ddffe
TSALC - TS; Rev A. Adding in silkscreen markings. Board has TS and GLV markings separated by 8.26mm. This is the limit imposed by the optocoupler. The rules state that optocouplers are exempt. However, they will likely consider any copper leading up to the device to be TS components to be dealt with. TSALC - TS; Rev A. Pull request #5. TSALC boards now ready for pull request review. ---SQUASH--- TSALC - Capacitors updated with new EDA files. Capacitors now current.
by Michael Pass 5 years 10 months
e8c7bee4
TSALC - GLV; Rev A. GLV ready for pull request review. This board has nothing but GLV components on it. Interface to TS board occurs between VCC and TSAL_CONTROL_SIGNAL Squash - TSALC - GLV; Added pull-down resistor to input.
by Michael Pass 5 years 10 months
7748bbd2
TSALC - Initial draft. Cleared up come wiring conflicts Board Schematic Update 555 Timer Circuit changed accordingly. (ref. https://www.allaboutcircuits.com/tools/555-timer-astable-circuit/) Flash Frequency = 4.80 Hz Duty Cycle = 66.67% Board Revision Update( Rev B) Both board and schematic updated. Clearance issues still remain. Some component values need to be verified again. TSALC - TS initial revision. Squash - TSALC - Added current limited resistors to OK1. Squash - TSALC - Hand routing complete. GLV components moved over to a separate board with minimal connections left on TS part. Distance explicitly shown on silkscreen. Will require conformal coating to fall in specification. All high volt connectors are on the top of the board (vertical connectors chosen, as this will occur outside of accumulator container.) Will tidy silkscreen and check for DRC errors. ---SQUASH--- TSALC - Silkscreen additions. Logo and author addition. TSALC - GLV board completed. ---SQUASH--- Preliminary layout completed for GLV. Must silkscreen and double check connections between GLV and TS boards. TSALC - Silkscreen additions. Initial silkscreen work done. Inputs and outputs must be annotated.
by Michael Pass 5 years 10 months
2dab8819
PROJ - Arduino Nano/SoundFX added to IowaFormula.lbr.
by Michael Pass 5 years 10 months
430c1f77
PROJ - SparkFun.lbr and microbuilder.lbr Adding old SparkFun library (deprecated, but used by previous open source schematics), and microbuilder library. This will allow for easier creation of Arduino/Adafruit PCB machine pin sockets.
by Michael Pass 5 years 10 months
b4e9dd67
PROJ - L78L08ABD13TR added to IowaFormula.lbr.
by Michael Pass 5 years 10 months
7c5d62ed
PROJ - EKXF451ELL100MJ20S.lbr. Added electrolytic capacitor for 450VDC rated cap.
by Michael Pass 5 years 10 months
919bfbbb
Merge pull request #2 from michaelpass/mmp-CHARGE CHARGE - Rev A. Pull request #2 completed without any major issues remaining. GERBER files for Rev. A created.
by Michael Pass 5 years 10 months
5ba56ec3
Report a bug