Updated U$7
updated u$7 on brd and sch file to include value and part number
by
slapplebags
5 years 6 months
Schematic cleanup
placed decoupling caps where they are located on the board. Placed items in groups and did my best to place nets near their origins. Also generally group items where they are located on the board.
by
slapplebags
6 years 3 months
added breakout mount holes
added 2.8mm mounting holes with mouse bites for easy removal.
by
slapplebags
6 years 6 months
Schematic cleanup
first pass at making the schematic more readable. Moved components to be more in line with the board layout.
by
slapplebags
6 years 6 months
Fixed airwire issue
Fixed an issue with the v2 board that resulted from upgrading eagle to v9. It caused lots of very short airwires.
by
slapplebags
6 years 6 months
Added gps backup cap
added gps backup capacitor. Corrected serial voltage divider resistor values. Removed ground vias below gps module.
by
slapplebags
6 years 7 months
fixed 3v reg
the 3v reg wiring was corrected and output cap moved closer to the regulator.
by
slapplebags
6 years 7 months
added buck regulator
swapped the linear regulator for a buck converter.
by
slapplebags
6 years 7 months
updated rf paths
seperated RF GND from GND and coupled via an inductor. Implemented path cleanups. Made all RF impedence matched.
by
slapplebags
6 years 8 months
- 1 of 100
- ››