Rev2 : rewired and verified footprints
by ThomasBandin 1 week 5 days
Avancée pcb + schéma final
by ThomasBandin 1 week 6 days
Finished Schematic, awaiting group validation
by ThomasBandin 2 weeks 2 days
Finished Schematic except Filtering, waiting on so...
by ThomasBandin 2 weeks 4 days
Finished Schematic except Filtering, waiting on some input from the team

Created PCB and began placing
Packed the work of today for further use
by ThomasBandin 2 weeks 4 days
Added STM32 Full pinout to fix library errors.
by ThomasBandin 2 weeks 5 days
Added STM32 Full pinout to fix library errors.
Cleaned Maxim schematic for cleaner look
Pushed Orlane Code onto the repository
by ThomasBandin 3 weeks 2 days
Avancement 28/10/25
by ThomasBandin 4 weeks 7 hours
Avancement 28/10/25

Partie Power : T_ban
Finalized the Buck and LDO for the power circuit (...
by ThomasBandin 1 month 3 weeks
Finalized the Buck and LDO for the power circuit (waiting for approval)

Created multiple sheet for cleaning the main file
Added TPS schematic
by ThomasBandin 1 month 3 weeks
Report a bug