Swaped RF2 to E28-2G4M27S
by Michael Pham 7 months 4 days
Added Payload Power Load Switch
by Michael Pham 7 months 4 days
Initial DRC Errors Cleaned Up
by SSL-Rey 7 months 5 days
Added MCP GPIO Expander and RP2350
by Michael Pham 7 months 5 days
Layout of New DF13 Solar Connectors
by Michael Pham 7 months 5 days
Added Heater Control to Layout
by Michael Pham 7 months 5 days
Added Heater Load Switches to Schematic
by Michael Pham 7 months 5 days
Deleted OreSat Antenna Deploy
by Michael Pham 7 months 6 days
Deleted Shift Register
by Michael Pham 7 months 6 days
Corrected Load Switch Erratum
by Michael Pham 7 months 1 week
Corrected Load Switch Erratum

The load switch current limit resistors are pulled down now instead of up!
Report a bug