Swaped RF2 to E28-2G4M27S
by Michael Pham 1 month 4 weeks
Added Payload Power Load Switch
by Michael Pham 1 month 4 weeks
Initial DRC Errors Cleaned Up
by SSL-Rey 1 month 4 weeks
Added MCP GPIO Expander and RP2350
by Michael Pham 1 month 4 weeks
Layout of New DF13 Solar Connectors
by Michael Pham 1 month 4 weeks
Added Heater Control to Layout
by Michael Pham 1 month 4 weeks
Added Heater Load Switches to Schematic
by Michael Pham 1 month 4 weeks
Deleted OreSat Antenna Deploy
by Michael Pham 2 months 13 hours
Deleted Shift Register
by Michael Pham 2 months 13 hours
Corrected Load Switch Erratum
by Michael Pham 2 months 21 hours
Corrected Load Switch Erratum

The load switch current limit resistors are pulled down now instead of up!
Report a bug