Moved stuff around on the layout, still need to fa...
by
thegizmodojopresident
6 years 6 months
Moved stuff around on the layout, still need to fanout the large
processor, place the power regulators, place the door switch connector,
place the RFID connectors, and place the LCD connectors. Once all parts
are placed, routing can begin.