all parts placed within board outline
by thegizmodojopresident 7 years 1 month
19c98094
Moved stuff around on the layout, still need to fa...
by thegizmodojopresident 7 years 1 month
Moved stuff around on the layout, still need to fanout the large
processor, place the power regulators, place the door switch connector,
place the RFID connectors, and place the LCD connectors. Once all parts
are placed, routing can begin.
2332c9d6
moving stuff around
by thegizmodojopresident 7 years 1 month
fa75e467
rearranging footprints on layout
by thegizmodojopresident 7 years 1 month
3dfc7768
added one resistor, about to rip up all traces and...
by thegizmodojopresident 7 years 1 month
added one resistor, about to rip up all traces and move all the parts around
92d4212c
changed footprint for TSOT23 handsoldering to be m...
by thegizmodojopresident 7 years 1 month
changed footprint for TSOT23 handsoldering to be more reasonable
37fc5d9d
Updated Schematic
by thegizmodojopresident 7 years 1 month
82c1afb3
changed footprints for SMB and SOT-23 so the hands...
by thegizmodojopresident 7 years 1 month
changed footprints for SMB and SOT-23 so the handsoldering is more reasonable
1321c6ac
imported netlist
by thegizmodojopresident 7 years 1 month
cd030a00
fixed S2A and motor drive capacitor footprint link...
by thegizmodojopresident 7 years 1 month
fixed S2A and motor drive capacitor footprint links
042883cf
Report a bug