In preperation for the final order, re-export all ...
by Eric Kuzmenko 6 years 2 months
In preperation for the final order, re-export all the manufacturing files using the current date and rev number v1.0.0

Add the fab's stackup, panel array working files, and their CPW calculations
Make the ENET_* traces on the top layer 53mils in ...
by Eric Kuzmenko 6 years 11 months
Make the ENET_* traces on the top layer 53mils in order to ensure they have a 50Ohm single-ended impedence, move one of the 5V_P bypass caps close to the SoM end of the USB2 diff pair, add meanders to the ENET_TXC, ENET_TX_CTL, ENET_RX_CTL in order to ensure these segments are matched to the long ENET_RXC segment (56.051mm, the rest of the RGMII signals are <10mm skew from this length and don't need adjusting, re-route the SIM card such that UIM-RESET is routed in between UIM-CLK and UIM-DATA as recommended by a BB manufacturer
Place and route the JTAG circuit, place and route ...
by Eric Kuzmenko 6 years 11 months
Place and route the JTAG circuit, place and route the BOOT_MODE slide switch circuit, place and route the user-LED circuit, place and route the top-level sheet passive components (I2C2 pull-ups, 5V_SOM, 3V3_OUT, & ENET_2V5 bypass caps, PWR_EN pull-down, USB2_VBUS voltage divider for SoC's comparator, etc), route the microphone to the analog audio switch IC, update the schematic, BoM, and footprints to reflect the MHF4 coax cable change (including them being 5cm long)

Unrouted count is now 324. The power circuit and the display are what is now left to be placed on the board, a few nets currently on the board still need to be connected (~120). 3V3_SNVS and various other misc. power rails still need to be routed on the power plane (vias need to be placed near pads).

JTAG header footprint is accessible from the display side (not underneath the display). User-LED is in a location as-close-as-possible to the bottom center of the board (somewhat near the microphone).

Serpentine bends still need to be added to the CSI to match the intra-pair skew, still need to move the prox sensor to the top of the board!
Add pi-matching circuit to the baseband modem ante...
by Eric Kuzmenko 6 years 11 months
Add pi-matching circuit to the baseband modem antenna's feedline

The return path for the antenna may have to have a 6.8nH Murata LQG15HN inductor installed on it (cutting the ground trace shorting the pads). The BoM was updated with the new components and everything was reannotated and updated (page 2's caps were out of order).
Update the WWAN/BB antenna to use the Antenova SR4...
by Eric Kuzmenko 6 years 11 months
Update the WWAN/BB antenna to use the Antenova SR4L034-R antenna
Add ANT-LTE-CER-T as the baseband modem antenna in...
by Eric Kuzmenko 6 years 11 months
Add ANT-LTE-CER-T as the baseband modem antenna into the schematic and BoM, update the layout accordingly
Use MHF4 instead of U.FL connectors on the WiFi+BT...
by Eric Kuzmenko 6 years 11 months
Use MHF4 instead of U.FL connectors on the WiFi+BT antennae
Add WiFi+BT antenna footprint, add pi matching cir...
by Eric Kuzmenko 6 years 12 months
Add WiFi+BT antenna footprint, add pi matching circuit to the WiFi+BT antennas' feedlines, increment the capacitor part numbers on page 18 after adding the new (NC) feedline caps and make the respective changes to the reference designators in the BoM
Change all 0603 capacitors _EXCEPT_ the 2.2uF, 4.7...
by Eric Kuzmenko 7 years 7 hours
Change all 0603 capacitors _EXCEPT_ the 2.2uF, 4.7uF, 8.2uF, 10uF, and 22uF caps to 0402
Reduce all 0603 resistor sizes to 0402
by Eric Kuzmenko 7 years 8 hours
Report a bug