PROJ - Gerber files major milestone - 05/05/19.
by Michael Pass 5 years 3 weeks
PROJ - Final pre-purchase revisions (4 boards still in progress.)
by Michael Pass 5 years 3 weeks
TSAL - Resizing.
by Michael Pass 5 years 3 weeks
TSALC - GLV; Rev A. GLV ready for pull request review. This board has nothing but GLV components on it. Interface to TS board occurs between VCC and TSAL_CONTROL_SIGNAL Squash - TSALC - GLV; Added pull-down resistor to input.
by Michael Pass 5 years 1 month
TSALC - Initial draft. Cleared up come wiring conflicts Board Schematic Update 555 Timer Circuit changed accordingly. (ref. https://www.allaboutcircuits.com/tools/555-timer-astable-circuit/) Flash Frequency = 4.80 Hz Duty Cycle = 66.67% Board Revision Update( Rev B) Both board and schematic updated. Clearance issues still remain. Some component values need to be verified again. TSALC - TS initial revision. Squash - TSALC - Added current limited resistors to OK1. Squash - TSALC - Hand routing complete. GLV components moved over to a separate board with minimal connections left on TS part. Distance explicitly shown on silkscreen. Will require conformal coating to fall in specification. All high volt connectors are on the top of the board (vertical connectors chosen, as this will occur outside of accumulator container.) Will tidy silkscreen and check for DRC errors. ---SQUASH--- TSALC - Silkscreen additions. Logo and author addition. TSALC - GLV board completed. ---SQUASH--- Preliminary layout completed for GLV. Must silkscreen and double check connections between GLV and TS boards. TSALC - Silkscreen additions. Initial silkscreen work done. Inputs and outputs must be annotated.
by Michael Pass 5 years 1 month