PROJ - Gerber files major milestone - 05/05/19.
by
Michael Pass
5 years 9 months
PROJ - Final pre-purchase revisions (4 boards still in progress.)
by
Michael Pass
5 years 9 months
PROJ - Silkscreen modifications - 50%.
by
Michael Pass
5 years 9 months
TSAL - Resizing.
by
Michael Pass
5 years 9 months
CHARGE - Rev A.
Pull request #2 completed.
GERBER files created for Rev. A.
by
Michael Pass
5 years 10 months
CHARGE - PR#2 requests made per @rgoedken.
- Third mosfet added in.
- Connector expanded to 8 pin
- AIR+/- added in
- Short device used to handle connections to power rail
- 5A fuse added in. 885 makes 5A.
- 100 ohm gate resistors added into three mosfets.
- DRC/ERC errors checked.
Squash - CHARGE - Final PR revisions.
Squash - CHARGE - Changed resistor values to allow 30mA instead of 20mA.
by
Michael Pass
5 years 10 months
CHARGE - Initial component placement/schematic revision.
A major design decision at this point will be whether or not to mount
the precharger onto the CHARGE board itself.
To determine this, schematic was revised, and parts were created to
test out footprint.
---SQUASH---
CHARGE - Checkout master to add ZEVA library.
ZEVA party created while in CHARGE branch.
Housekeeping down to merge this part into the master branch to make
it available to everyone.
---SQUASH---
SQUASH; CHARGE - Rebase with master
CHARGE - Routing code corruption.
---SQUASH---
CHARGE - Pull request revisions.
Final details finished for formal pull request. Revision requested.
by
Michael Pass
5 years 10 months
PROJ - Pulling in changes from mmp-CHARGE for ZEVA pre-charge
A library part was needed for ZEVA smart precharger in order to play around with board placement. Very close approximation for footprint, with exact drill hole location achieved.
Amend - Incorrect stash attempt. Files copies over manually
from working mmp-CHARGE.
by
Michael Pass
5 years 10 months
PROJ - Workstation modified files.
Git history had become polluted with multiple trivial commits.
Git branching/merging policy will now be followed through GitHub.
WLS system set up. Anshuman's git history caught up.
All systems under management have now been merged at this common commit.
by
Michael Pass
5 years 10 months
BSPD - Schematic revision/component revision.
During ESF, schematics chosen used European part libraries.
These were updated to US symbols, with appropriate final parts sourced
to allow builds of both SOP8 and DIL-8 packages.
by
Michael Pass
5 years 10 months
- 1 of 100
- ››